How the Studio developed
Modern Acre Studio began on home building job sites in Ohio, on construction schedules in Kentucky, and across five and a half years of institutional architecture — then came home to the one building type where the client and the occupant are the same person.
- 2015 — 2016Commercial Design
Civic work, and the discipline it demands
The career opened in commercial practice — civic and educational buildings, carried through every architectural design phase. Public work is unforgiving. It answers to codes, to review boards, to budgets that are argued in public, and to a service life measured in decades rather than years.
It is an unglamorous education in why a drawing has to be right the first time, and it set the standard for everything that came after it.
- 2016 — 2018Residential Construction
Two years with boots on the site
Then a deliberate step off the drawing board and onto the job site — running residential construction as project manager and superintendent. Estimating. Contract negotiation and review. Material and labor scheduling. The daily work of keeping trades moving in the right order.
Most architects never do this. It is the difference between drawing a detail and knowing what that detail costs, how long it takes, and whether the crew in the field can actually build it.
- 2018 — 2019Residential Design
Learning the house itself
Back to design, and this time purely residential — custom homes, additions and renovations across two studios. A house is small enough that one person can hold the entire thing in their head, and demanding enough that every compromise eventually shows.
This is where designing around how a family actually lives stopped being theory.
- 2019 — 2025Institutional & Commercial Architecture
Five and a half years at institutional scale
The longest chapter, and the one that produced the license: five and a half years at SHP, advancing from project designer to registered architect. Work spanned every phase of a project, from concept design through construction administration, across a wide range of building types.
Design concepts. Detailed drawings and specifications. Coordination with engineers, consultants and contractors. Permitting and code-compliance review. Project documentation, and site visits to hold the built work to what was drawn.
Large projects teach coordination in a way small ones never can. When a dozen consultants have to agree before anything is poured, documentation stops being paperwork and becomes the thing holding the whole project upright.
- 2024 — PresentCustom Residential Architecture
Back to the house, deliberately
In institutional work, the person who signs the drawings is almost never the person who lives with them. Decisions move through committees, boards and budget cycles, and the finished building serves a population rather than a person.
A house is the exact opposite. There is one client, that client is the end user, and they live inside every decision — where the morning light lands, which way the door swings, what the room costs to cool in August.
Modern Acre Studio exists to bring the rigor of institutional practice down to that scale: genuine code and permitting discipline, structural and MEP engineering coordinated under one roof, and building science built for a Texas summer — with the client speaking directly to the architect drawing their house, start to finish.
Credentials earned along the way
A Master of Architecture and a Bachelor of Science in Architectural Engineering, licensure with the Texas Board of Architectural Examiners (License #31455), and fourteen industry credentials spanning design, sustainability and high-performance building science.
SEE ALL FOURTEEN CREDENTIALS →Every one of these years left something we won’t trade away.
The land first. One architect start to finish. Beauty and building science at the same table. Six commitments behind every home we design.
OUR VALUES — LEARN MOREHave land in mind?
Tell us about the home you picture on it, and we’ll arrange an initial conversation.
START A PROJECT